CALL US :   +605-891 6528
  • HOME
  • ABOUT US
    • Who We Are
    • Organisation
    • Future
    • Our Values
  • WHAT WE DO
    • Asphalt Processing
    • Concrete Processing
    • Road Building
    • Logistic and Machineries Supports
    • Other Businesses
  • PROJECTS
  • OTHERS
    • News Update
    • Certifications
    • QC/Laboratory
  • CONTACT US
MENU CLOSE BACK  
Asphalt Processing

 

Asphalt Plants in Kamunting, Perak

Asphalt Plant 1: PPP Continuous Drum Mix Plant: Fully computerised producing at capacity of 100 ton per hour.

Asphalt Plant 2 : Niigata 1500 Asphalt Batching Plant: Fully reconditioned and computerised. This plant produces special mixed asphalt, eg. Porous asphalt and Stone Mastic Asphalt. To date, KPP has supplied more than 10000 tons of Porous asphalt. When in Drum mode, this plant can produce up to 150 ton of asphaltic premix per hour.

Asphalt Plant 3: 250 tons per hour Linhoff Continuous Drum Mix Plant.


Asphalt Plants in Simpang Pulai, Ipoh

Asphalt Plant 1 : Continuous Drum Mix Plant: At Simpang Pulai fully computerised and producing at capacity of 150 ton per hour.

Asphalt Plant 2 : 100 ton per hour Linhoff Continuous Drum Mix Plant.

CBM plant with capacity to produce 150 ton per hour.

The Asphalt Processing Batching Plant can produce 200 ton per hour of hot mix asphalt. It can produce a full of hot mix asphalt from the normal type to special mixes like SMA and Porous Asphalt.


CBM Plant

At Kamunting Industrial Estate producing at capacity of 150 ton per hour.


 

 

Asphalt Products

Dense Bitumen Macadam
Used as based material for heavy vehicle lanes



Asphaltic Concrete Binder Course


Bukit Merah, Plus

ROB 11, Taiping, MMC-Gamuda

Jelapang, PLUS

 


Asphaltic Concrete Wearing Course
We use bitumen grade 60/70, 80/100, and polymer modified PG76 depending on our client requirement.


Land Viaduct, Bukit Merah-Parit Buntar, MMC-Gamuda

Changkat Larah, Taiping, MMC-Gamuda

PMB ACWC at Kulim Hitech Techno Park, Belati Wangsa

 


Stone Mastic Asphalt (Kamunting)
> Double the life span of normal ACWC. Prevent skidding due to rough texture.
> Used at locations where maintenance is difficult especially at city centre.
> Project undertaken at structural pavement rehabilitation project at km259 NB, km229SB (7 km) and km242SB (7 km) at Section N5 of the North South Expressway, by PLUS.


Rough Texture

SMA at Changkat Jering-Kuala Kangsar, PLUS

 



Porous Asphalt (Kamunting)
> Advantage of use at water crossing areas and cornering.
> Eliminate hydro plane action while driving during raining season.
> Project undertake at various accident spots of North South Expressway : Sungkai-Bidor, Tapah-Gopeng, Jelapang-Kuala Kangsar, Changkat Jering-Taiping Utara, Bandar Baharu-Jawi, Bandar Baharu-Bukit Merah, etc.

 


Copyright © KAMUNTING PREMIX PLANT SDN BHD (Reg. 158038-U). All rights reserved. Best Viewed IE 8 & above, Google Chrome.